- Completed wiring for low voltage lighting for lower right patio.
- Installed 12” drain pipe around entire lower right patio.
- Installed catch basins.
- Completed south wall installation on lower right patio.
- Graded dirt against south wall of lower right patio.
- Removed bluestone from upper patio.
Next Week’s Planned Activities
- No work planned Saturday or Sunday.
- Continue blocking up fireplace on lower right patio.
- Install grill and doors for kitchens in lower right patio.
- Start base installation for lower right patio.
Current Safety Concerns
None.Material Deliveries Scheduled
Gray block and cast veneer stone on Monday