- Began installing outdoor kitchens on lower right patio.
- Continued installing south wall.
- Continue kitchen installation, which should be completed by noon.
- Continue with south side wall installation.
None.
Material Deliveries Scheduled
Possible trucks in and out all day removing dirt.
Comments
Ramp between patios remains closed pending installation of railing and sidewalk above lower right patio remains closed until excavation filled in.