Sunday, December 2, 2007

Updated Courtyard Access Map

We are very pleased that we are ending the construction of the upper patio by the middle of next week, and we will open the walkway to the left of the pool and the new upper patio, close to Mologne House. We will soon begin construction of the lower patio/ramp area. Our plan is to focus on the ramp and the patio to the left of the ramp first (as indicated by the area in orange), then the right lower patio area. This is the second major phase of our construction.


We apologize for the inconvenience that we are about to cause, and we hope to limit the restriction on your access to the Courtyard as much as possible.


As construction begins, and throughout the entire period of work, we will provide maps here indicating walkways and paths which may be impacted by the work being done. Please check back regularly. To view a full-sized map, simply click on the image below.


Malone map


From December 4 through January 10, the following items will be important to note:

  • The entrance/exit from the Breezeway in Mologne House to the Courtyard will be shut off entirely. This closure is indicated in red on the map.

  • You will have to detour from the Breezeway around the parking lot side of Mologne House to the walkway near the staging area for the construction equipment past the Playground. This closure is indicated in blue on the map.

  • In addition, areas marked in yellow on the map may be blocked temporarily when construction equipment is in transit. Flagmen will provide guidance at these times.

No comments: